Time:2026-11-26 09:00:00 Popularity:9
A 30-day month holds 720 hourly slots. Remove 96 planned maintenance hours and the same 624 valid readings report as 100% on a 624-hour denominator but 86.7% on a 720-hour one. For dust monitoring data that choice must be fixed before stations are ranked, otherwise a denominator picked after the results are seen can make any site appear acceptable.
A valid hour is an hour in which the station was scheduled to measure and produced a concentration that can be defended against its flag log. It is not simply an hour in which the device was powered. Completeness is a ratio, and a ratio without a stated denominator is not a result.
Two denominators are in common use. The calendar-hour denominator counts every hour in the reporting window: 24 per day, 720 per 30-day month. The required-hour denominator subtracts hours in which measurement was not expected, such as planned calibration or a documented service window.
Under the calendar rule, 624 valid readings out of 720 slots give 86.7% completeness. Under the required-hour rule, the same 624 readings out of 624 expected slots give 100%. Neither calculation is wrong; they answer different questions about dust monitoring data.
A further rule sits underneath both: how many samples make an hour valid. A common threshold is 12 of 12 five-minute samples, which is a typical engineering reference value and should be confirmed against your own data policy and the current NiuBoL datasheet. State the threshold in the method note so another engineer can reproduce it.
The published PM2.5 span of 0–1000 µg/m³ and the stated 0–99% RH operating environment come from the NiuBoL particulate matter sensor page; liquid moisture entering the circuit is excluded by that specification. These two figures belong in the flag rules, not in a completeness denominator.
An hour becomes invalid because of a reason, not because of a low or high number. Store the reason alongside the concentration so the exclusion can be audited later. Five conditions cover most cases in dust monitoring data.
Figure 1. Combined air temperature and relative humidity sensor.
Planned calibration is the cleanest case: a logged window in which the instrument is not measuring ambient air. A 3 h event removes two hours from a 6 h block if sampling resumes mid-hour, so record the exact start and end rather than rounding to whole hours.
A communication outage removes hours when no record reached the logger. The gap is measured at the receiver, so a one-minute delay is not an outage. The detection threshold below is a typical engineering reference value and must be set to match the polling interval of the network.
A zero freeze is a run of identical values that are implausible for an active site. Over-range is a value above the stated span, which the datasheet places at 1000 µg/m³ for PM2.5. High-RH optical deviation is a flag based on humidity and reference disagreement, not an assumption about the underlying physical mechanism.
The inputs are assumed, not measured. A 30-day window gives 720 hourly slots. Planned calibration runs twice for 3 h each. A communication outage removes 18 h. A zero freeze affects 9 h. No other loss is assumed, so every required hour returns a defensible value.
Input: 720 h calendar, 2 × 3 h calibration, 18 h outage, 9 h freeze. Formula: excluded = 6 + 18 + 9 = 33 h; required = 720 − 33 = 687 h; calendar completeness = valid ÷ 720; required completeness = valid ÷ 687. All values are in hours unless stated.
Result: valid hours equal 687. Calendar completeness is 687 ÷ 720 = 95.4%. Required completeness is 687 ÷ 687 = 100%. The gap is 4.6 percentage points, produced entirely by the choice of denominator and not by any change in instrument behaviour.
This is an illustrative calculation based on assumed site values, not a measured field record. The boundary matters as much as the arithmetic: backfilled data must not be written back into the real-time valid-hour count. The 18 h outage remains excluded from real-time completeness even if every record is later recovered.
Instrument availability asks whether the unit was powered, online and answering polls. Data availability asks how many required hours carry a concentration that survives the flag rules. They are different columns in a report and should never be merged.
Figure 2. Agricultural Weather Station Products (1).
Consider the same 720 h window. A logger that answers 712 of 720 polls reports 98.9% uptime. Yet 33 h are excluded by flags, leaving 687 valid hours, or 95.4% of calendar slots. Uptime overstates usable dust monitoring data by 3.5 percentage points in this assumed case.
The direction of the error is not fixed. A station can be online for nearly every hour while its optical channel sits in a zero freeze; high uptime then hides a data problem. Conversely, a short radio outage may reduce uptime without affecting the hours that matter if those hours were already outside the required set.
Procurement questions should therefore separate the two. Ask for the polling and diagnostic registers on one side, and for the flag logic and exclusion export on the other. A specification that quotes only network availability says nothing about the completeness figure a reviewer will compute.
Backfill changes when a value arrives, not when it was measured. Three timestamps should remain distinct: the sample time, the time the record reached the logger, and the time any late record was inserted. Collapsing them into one field destroys the ability to audit completeness.
A defensible rule is to keep the original invalid flag attached to the hour even after a late record fills the gap. The recovered value can appear in a separate archival dataset with its own label, but it must not raise the real-time valid-hour count. Otherwise an 18 h outage quietly becomes a month that appears to have no gaps.
In the worked example, the 18 h outage stays excluded under both denominators. If the late records were counted as real-time valid, required completeness would move from 100% to a number that hides the communications failure entirely. That is a reporting change, not a measurement improvement.
Name the datasets explicitly in the method note: a real-time completeness series and an archival series. State which one is used for station comparison and which one is used for later concentration statistics. This prevents a reader from assuming that backfill and live data carry the same status.
Completeness becomes useful for site comparison only when the exclusion rules are identical. Two stations with the same 95.4% calendar score can have very different required-hour scores if one schedules 96 maintenance hours and the other schedules none. Normalize the schedule before ranking anything.
Use required hours for a like-for-like comparison, because planned downtime is not a performance difference. Keep calendar hours for a contract that promises continuous coverage, where planned work is still a coverage gap. Reporting both figures is often the clearest option when schedules differ.
Publish the exclusion list with the score: calibration hours, outage hours, freeze hours, over-range hours and high-RH flags. In the worked example, the 4.6-point gap between denominators is only interpretable because the 33 excluded hours are itemized. Without that list, the gap is noise.
A practical review order is: confirm the window, confirm the sample threshold, confirm the flag reasons, then compute the ratio. If any of the three inputs is missing, hold the comparison rather than filling the blank with an assumption about dust monitoring data quality.
Completeness measures presence, not accuracy. A month with 720 of 720 valid hours can still carry a systematic bias if the sensor drifted, if the site was moved, or if a plausible-looking zero freeze was never flagged. A high score is a reason to proceed to verification, not a conclusion.
Figure 3. Weather Station Outdoor Protective Box.
The method also fails when the exclusion log is incomplete. If planned calibration is not recorded, those hours enter the denominator as expected measurements and depress the score. If a fault is recorded but the reason is missing, the hour cannot be classified consistently across sites.
It does not replace calibration checks, flow verification or a review of the concentration distribution. It also says nothing about alarm thresholds, inlet geometry or where instruments should be placed; those are separate design questions with separate evidence. Use completeness only for what it measures.
Treat any score derived from assumed values as a demonstration of the arithmetic. The worked example above is such a demonstration. A real acceptance decision needs the site's own timestamps, flag reasons and sampling policy in the same table.
FAQ
Q1. How many valid hours should a 30-day month contain?
A 30-day month always contains 720 calendar hours (30 × 24). If 96 hours are planned calibration or maintenance, the required-hour denominator is 624. A station with no other loss then reports 624 valid hours. The calendar denominator stays 720, so the same 624 readings score 86.7% against it and 100% against 624.
Q2. Should backfilled hours count as real-time valid hours?
No. A value that arrives after the fact keeps its original invalid flag. In the worked example the 18-hour outage stays excluded from real-time completeness even if every missing record is later recovered. Backfill may support a separate concentration summary, but it must not silently convert a communications gap into a valid real-time hour.
Q3. What is the difference between instrument availability and data availability?
Instrument availability asks whether the unit was powered and communicating, often near 99% for a networked site. Data availability asks how many required hours carry a defensible concentration. A powered instrument in a zero freeze can show 99% uptime yet only 687 of 720 valid hours. Only the second number belongs in a completeness report.
Q4. Can high humidity alone invalidate an hour?
High humidity is a flag, not an automatic exclusion. Flag an hour when relative humidity approaches saturation and the optical channel deviates from its expected relationship with co-located references. This is a data-quality decision, not a claim about the underlying physical mechanism. Record the RH value and the flag reason so the decision can be audited later.
Q5. Which denominator should I use when comparing two sites?
Use required hours when both sites publish the same exclusion rules; it removes planned downtime from the comparison. Keep calendar hours for a contract that promises continuous coverage. Report both if sites have different schedules. A 4.6-point gap between denominators is meaningless unless the exclusion lists behind them are identical.
Q6. How many samples make an hour valid?
A common rule is at least 12 of 12 five-minute samples, though that threshold is a typical engineering reference value and should be confirmed against your own data policy and the current NiuBoL datasheet. If only eight samples survive, mark the hour partial rather than simply valid, and state the rule in the method note.
Summary and next steps. Define the denominator before computing any completeness figure, because 624 valid hours can read as either 100% or 86.7%. Then take three actions: write the flag rules into the acceptance procedure, export separate real-time and archival datasets, and require an itemized exclusion list with every site score. For procurement, ask the supplier to confirm the sample threshold and the diagnostic registers against the current datasheet before the figures enter a contract.
State the denominator before you report completeness
Dust monitoring data cannot be judged without a fixed denominator. A month with 720 calendar hours, 33 hours of planned calibration, outage and frozen-zero records leaves 687 required hours; the same valid readings score 100% on one denominator and about 95.4% on the other. Backfilled values may be archived with their own flag, but they must not be counted as real-time valid hours. Write the exclusion rules and the denominator into the report before sites are compared.
Comparing station completeness across sites? Send the hour count, exclusion rules and backfill policy through our contact page, and we will help you fix one denominator first.
Prev:Water Quality Flow Cell: When Is the Reading Stable?
Next:no more
Related recommendations
Sensors & Weather Stations Catalog
Agriculture Sensors and Weather Stations Catalog-NiuBoL.pdf
Weather Stations Catalog-NiuBoL.pdf
Agriculture Sensors Catalog-NiuBoL.pdf
Water Quality Sensor Catalog-NiuBoL.pdf
Related products
Combined air temperature and relative humidity sensor
TDR Soil Moisture & Temperature Sensor for irrigation| RS485 |4-20mA| NBL-S-THR
Soil pH sensor RS485 soil Testing instrument soil ph meter for agriculture |NBL-S-PH
Wind Speed sensor Output Modbus/RS485/Analog/0-5V/4-20mA
0.2mm Tipping Bucket Rain Gauge for Weather & Hydrology | NiuBoL
Pyranometer Solar Radiation Sensor 4-20mA/RS485
Screenshot, WhatsApp to identify the QR code
WhatsApp number:+8615367865107
(Click on WhatsApp to copy and add friends)